Workability Analysis for removal work

Performed several Down Time Analysis for heavy lift removal operation to support a study performed by Platform Brokers. The DTA tool has been used for this study which combines the dynamic characteristics of the heavy lift operation with historical weather data to determine down time risks.

Our client:

PB Consultants

Product/Service:

Share: