Platform Relocation Analysis with Asian Hercules III

Date: August 2019
Client: SPT Offshore
Product: Marine Engineering

MonobaseWind Marine Design

Date: January 2016
Client: MonobaseWind b.v.
Product: transport and Installation

Ophir Platform Lift and Mooring Analysis with Asian Hercules II

Date: August 2016
Client: SPT Offshore
Product: Marine Engineering

Dragon Oil LAM-E Jacket and topside installation

Date: Aug 2014
Client: CNGS Group
Project: Dragon Oil Lam-E Platform
Product: Transport and Installation Design


Global Tech 1 Project

Date: December 2011
Client: SPT Offshore / Keppel Verolme
Product: T&I Analysis

Large concrete Caisson

Date: September 2011
Client: Volker Construction International B.V.
Product: T&I Analysis

Venture/Centrica F3-FA

Date: September 2010
Client: SPT Offshore
Product: Operational Support, T&I Analysis

SIADAR Wave Power Scheme

Date: May 2009
Client: Volker Construction International
Product: T&I Analysis


Venture F3-FA

Date: February 2009
Client: SPT Offshore
Product: T&I Analysis

Delta Q13

Date: August 2008
Client: SPT Offshore
Product: Concept Design, T&I Analysis

TOP