Heerema Marine Contractor successfully launched and upended the Statoil Gina Krog jacket. The jacket was build be Heerema Fabrication (HFGE)  in Vlissingen and transported on the Saipem owned barge S600. Orca offshore was part of the HFGE jacket design team and was responsible for the Naval Architectural design of the Statoil Gina Krog jacket which included

Tagged under: , ,

Mooring Model Online

Wednesday, 03 February 2010 by

Online Marine Engineering, a service provided by ORCA-Offshore, has recently released the online version of the mooring model. The mooring model is an online service to perform a full 3D Dynamic Mooring analysis for multi line spread offshore moorings. The output of the model is a ready for issue report describing the used input, the

Tagged under:
TOP