WHP Platform relocated

WHP Platform relocated

SPT Offshore successfully relocated a wellhead platform in Asia. The platform was lifted and transported to the new location with the Asian Herculess III. SPT Offshore was responsible for the transport and installation scope.

Orca offshore was part of the SPT Offshore T&I team and was responsible for all the Naval Architectural design of the project which included the marine dynamic analysis and mooring analysis.

See project description