Projects
![Windplanblauw – Workability Analysis](https://www.orca-offshore.com/wp-content/uploads/2023/09/lr-martens-multimedia-2-400x284.jpg)
Windplanblauw – Workability Analysis
Date: March 2023
Client: Ballast Nedam
Product: Marine Engineering
![Dynamic Mooring Analysis Hutton Hull](https://www.orca-offshore.com/wp-content/uploads/2021/09/ISOview.Hutton.png)
Dynamic Mooring Analysis Hutton Hull
Date: May 2021
Client: MBM Consultancy
Product: Mooring Analysis
![Platform Transport Fatigue Analysis](https://www.orca-offshore.com/wp-content/uploads/2021/09/Schermafdruk-2021-03-31-11.57.10-e1631299559464-400x284.png)
Platform Transport Fatigue Analysis
Date: January 2021
Client: Non-Disclosed
Product: Structural Transport
![East Cendor Platform Lift and Mooring Analysis with Asian Hercules III](https://www.orca-offshore.com/wp-content/uploads/2020/09/Schermafdruk-2020-09-09-08.26.07-e1599632886261-400x284.png)
East Cendor Platform Lift and Mooring Analysis with Asian Hercules III
Date: November 2019
Client: SPT Offshore
Product: Marine Engineering
![DeltaCat Design for WTSU-010](https://www.orca-offshore.com/wp-content/uploads/2021/06/Schermafdruk-2020-06-13-15.31.45-400x284.png)
DeltaCat Design for WTSU-010
Date: June 2020
Client: Offshore Wind Logistics b.v.
Product: Vessel Design
![Marine T&I Analysis new production platform](https://www.orca-offshore.com/wp-content/uploads/2020/01/docking-lift-e1679825516592-400x284.jpg)
Marine T&I Analysis new production platform
Date: January 2020
Client: Non-disclosed
Product: Marine Engineering
![Platform Relocation Analysis with Asian Hercules III](https://www.orca-offshore.com/wp-content/uploads/2019/08/Afbeelding2-1-400x284.png)
Platform Relocation Analysis with Asian Hercules III
Date: August 2019
Client: SPT Offshore
Product: Marine Engineering
![OWF Norther Offshore Wind Farm – Trencher launch and recovery](https://www.orca-offshore.com/wp-content/uploads/2018/12/Plate02-400x284.jpg)
OWF Norther Offshore Wind Farm – Trencher launch and recovery
Date: Nov 2018
Client: DHLC and van Oord
Product: Lift Analysis
![Lift Analysis – OWF Deutsch Bucht – Gripper Frame Seajack Scylla](https://www.orca-offshore.com/wp-content/uploads/2018/12/Screenshot-2015-12-17-10.51.46-400x284.jpg)
Lift Analysis – OWF Deutsch Bucht – Gripper Frame Seajack Scylla
Date: June 2018
Client: Eager.One
Product: Lift Analysis
![MALIN Minesto Buoy Project](https://www.orca-offshore.com/wp-content/uploads/2017/11/Screenshot-2017-11-10-23.39.07-1-e1510501027736-400x284.jpg)
MALIN Minesto Buoy Project
Date: August 2017
Client: Malin Marine Consultants
Product: Motion Analysis
![MonobaseWind Marine Design](https://www.orca-offshore.com/wp-content/uploads/2017/04/Float01-400x284.jpg)
MonobaseWind Marine Design
Date: January 2016
Client: MonobaseWind b.v.
Product: transport and Installation
![Dana Petroleum Western Isles Berth Mooring Analysis](https://www.orca-offshore.com/wp-content/uploads/2017/03/western-isles-fpso-image-by-cosco-664x442-1-400x284.jpg)
Dana Petroleum Western Isles Berth Mooring Analysis
Date: February 2017
Client: Keppel Verolme
Product: Dynamic Mooring Analysis
![Ophir Platform Lift and Mooring Analysis with Asian Hercules II](https://www.orca-offshore.com/wp-content/uploads/2017/01/gra00016-e1483651025512-400x284.jpg)
Ophir Platform Lift and Mooring Analysis with Asian Hercules II
Date: August 2016
Client: SPT Offshore
Product: Marine Engineering
![Alphen a/d Rijn crane accident](https://www.orca-offshore.com/wp-content/uploads/2016/06/DSC_1398-400x284.jpg)
Alphen a/d Rijn crane accident
Date: June 2016
Client: Onderzoeksraad voor de veiligheid
Product:Project
![Drill Ship Sertao Berth Mooring analysis](https://www.orca-offshore.com/wp-content/uploads/2015/11/Project.Panel_.153030.r0_001.png-400x284.jpg)
Drill Ship Sertao Berth Mooring analysis
Date: September 2015
Client: Okeanos bv
Product: Mooring Analysis
![Vertiwind and Hywind Turbine Mating Analysis](https://www.orca-offshore.com/wp-content/uploads/2015/11/Afbeelding3-400x284.jpg)
Vertiwind and Hywind Turbine Mating Analysis
Date: August 2015
Client: SPT Offshore
Product: Mating Analysis
![SSCV Thialf Barge Mooring Analysis](https://www.orca-offshore.com/wp-content/uploads/2015/03/Project-panel.r0-400x284.gif)
SSCV Thialf Barge Mooring Analysis
Date: January 2015
Client: Heerema Marine Contractors
Product: Mooring Analysis
![Spud Pile Mooring analysis](https://www.orca-offshore.com/wp-content/uploads/2014/12/Project.Panel_.143026.r1-400x284.jpg)
Spud Pile Mooring analysis
Date: December 2014
Client: Ballast Nedam
Product: Mooring and stability Analysis
![Monobasewind Concept Modeltest](https://www.orca-offshore.com/wp-content/uploads/2014/11/MAXWAVE01-400x284.jpg)
Monobasewind Concept Modeltest
Date: November 2014
Client:Monobasewind bv
Product: Modeltest MonoBasewind
![Marathon ALBA B3 Structural transport analysis](https://www.orca-offshore.com/wp-content/uploads/2014/09/Transport.all_.png-400x284.jpg)
Marathon ALBA B3 Structural transport analysis
Date: July 2014
Client:IV Oil & Gas
Product: Structural Transport Analysis
![Dragon Oil LAM-E Jacket and topside installation](https://www.orca-offshore.com/wp-content/uploads/2014/09/fLOATOVER.png-400x284.jpg)
Dragon Oil LAM-E Jacket and topside installation
Date: Aug 2014
Client: CNGS Group
Project: Dragon Oil Lam-E Platform
Product: Transport and Installation Design
![Dredging Barge Mooring Analysis](https://www.orca-offshore.com/wp-content/uploads/2014/08/Project.Panel_.143013.r0-400x284.jpg)
Dredging Barge Mooring Analysis
Date: June 2014
Client: Kooiman Yard bv
Product: Dynamic Mooring Analysis
![Ulstein Pipelay vessel Workability Analysis](https://www.orca-offshore.com/wp-content/uploads/2014/07/gra00006-400x284.jpg)
Ulstein Pipelay vessel Workability Analysis
Date: June 2014
Client: Ulstein
Product: Workability Analysis
![Ulstein Sea of Solutions – Mooring analysis Transocean Semi Subs](https://www.orca-offshore.com/wp-content/uploads/2014/05/draw-400x284.jpg)
Ulstein Sea of Solutions – Mooring analysis Transocean Semi Subs
Date: May 2014
Client: Ulstein Sea of Solutions bv
Product: Dynamic Mooring Analysis
![Dutch Offshore Contractors Motion Response Unit](https://www.orca-offshore.com/wp-content/uploads/2014/05/2014-05-02-16.25.33.small_-rotated-e1626689355125-400x284.jpg)
Dutch Offshore Contractors Motion Response Unit
Date: May 2014
Client: Dutch Offshore Contractors bv
Product: Motion Response Unit
![Sea Trucks Group Chevron Delta LQ platform Dynamic Lift Analysis](https://www.orca-offshore.com/wp-content/uploads/2014/04/Project.Panel_.133012.r0-400x284.jpg)
Sea Trucks Group Chevron Delta LQ platform Dynamic Lift Analysis
Date: March 2013
Client: Sea Trucks Group
Product: Dynamic Lift Analysis / Workability Analysis
![Ballast Nedam Butendiek NMS Lifting Study](https://www.orca-offshore.com/wp-content/uploads/2014/03/Screenshot-2014-03-28-13.12.43-400x284.jpg)
Ballast Nedam Butendiek NMS Lifting Study
Date: December 2013
Client: Ballast Nedam
Product: Dynamics Lift Analysis
![Ulstein Petrofac JSD600 Stinger Fatigue Analysis](https://www.orca-offshore.com/wp-content/uploads/2013/10/Plate03..png-400x284.jpg)
Ulstein Petrofac JSD600 Stinger Fatigue Analysis
Date: January 2013
Client: Ulstein
Product: Structural Fatigue Analysis
![Statoil Gina Krog Jacket](https://www.orca-offshore.com/wp-content/uploads/2013/10/2013-01.Gina_.Krog_.01-400x284.jpg)
Statoil Gina Krog Jacket
Date: January 2013
Client: HFG Engineering
Product: Marine Design, T&I Analysis
![Mooring Analysis Jascon 25](https://www.orca-offshore.com/wp-content/uploads/2013/10/J25_small-400x284.jpg)
Mooring Analysis Jascon 25
Date: December 2012
Client: Sea Trucks Group
Product: Dynamic Mooring Analysis
![Zeetech Stinger Structural Analysis](https://www.orca-offshore.com/wp-content/uploads/2013/10/Stinger01-400x284.jpg)
Zeetech Stinger Structural Analysis
Date: November 2012
Client: Zeetech / Ulstein
Product: Structural Analysis
![Sevan Huntington Suction Pile Installation](https://www.orca-offshore.com/wp-content/uploads/2013/10/Sevan.01-400x284.jpg)
Sevan Huntington Suction Pile Installation
Date: September 2012
Client: SPT Offshore / Sevan Marine
Product: Operational Analysis
![ECO-V FPSO](https://www.orca-offshore.com/wp-content/uploads/2013/10/small.fpso_.jpg)
ECO-V FPSO
Date: August 2012
Client: Maritima de Ecologia S.A. DE C.V.
Product: Dynamic Mooring Analysis
![Global Tech 1 Project](https://www.orca-offshore.com/wp-content/uploads/2013/10/MOAB3.png)
Global Tech 1 Project
Date: December 2011
Client: SPT Offshore / Keppel Verolme
Product: T&I Analysis
![Workability Analysis for removal work](https://www.orca-offshore.com/wp-content/uploads/2013/10/Timetracetool-400x284.jpg)
Workability Analysis for removal work
Date: November 2011
Client: PB Consultants
Product: Workability Analysis
![SSCV Hermod](https://www.orca-offshore.com/wp-content/uploads/2013/10/2011-10-02-400x284.jpg)
SSCV Hermod
Date: October 2011
Client: Heerema Marine Contractors B.V.
Product: Dynamic Mooring Analysis
![Workover Semi Submersible](https://www.orca-offshore.com/wp-content/uploads/2013/10/2011-09-02-400x284.jpg)
Workover Semi Submersible
Date: September 2011
Client: Dutch Offshore Innovations
Product: Workability Analysis
![Large concrete Caisson](https://www.orca-offshore.com/wp-content/uploads/2013/10/2011-09-01-394x284.jpg)
Large concrete Caisson
Date: September 2011
Client: Volker Construction International B.V.
Product: T&I Analysis
![Consultancy and Interface management](https://www.orca-offshore.com/wp-content/uploads/2013/10/RAT01-271x284.jpg)
Consultancy and Interface management
Date: April 2011
Client: Shell U.K. Ltd. / NAM B.V.
Product: Interface Management, T&I Analysis
![Stability analysis floating tunnel element](https://www.orca-offshore.com/wp-content/uploads/2013/10/COEN-400x284.jpg)
Stability analysis floating tunnel element
Date: January 2011
Client: Coentunnel Construction V.O.F.
Product: Stability Analysis
![Operational Decision Support System](https://www.orca-offshore.com/wp-content/uploads/2013/10/Project.Panel_.113003.r0-400x284.jpg)
Operational Decision Support System
Date: February 2011
Client: Tideway Offshore Contractors
Product: ODS
![IDEA Heavy Equipment](https://www.orca-offshore.com/wp-content/uploads/2013/10/Hammer-400x284.jpg)
IDEA Heavy Equipment
Date: December 2010
Client: IDEA Heavy Equipment
Product: Calculation of Lift Dynamic Amplification Factor
![Carbon Trust Self Installing Wind Turbine](https://www.orca-offshore.com/wp-content/uploads/2013/10/SIP3.01-400x284.jpg)
Carbon Trust Self Installing Wind Turbine
Date: September 2010
Client: SPT Offshore
Product: Marine Design
![Venture/Centrica F3-FA](https://www.orca-offshore.com/wp-content/uploads/2013/10/16_Centrica_F3FA-400x284.jpg)
Venture/Centrica F3-FA
Date: September 2010
Client: SPT Offshore
Product: Operational Support, T&I Analysis
![Svanen at Walney Offshore Wind Farm 2](https://www.orca-offshore.com/wp-content/uploads/2013/10/2009-08.big_-400x284.jpg)
Svanen at Walney Offshore Wind Farm 2
Date: July 2010
Client: Ballast Nedam International Projects
Product: Dynamic Mooring Analysis, Monopile Transport Analysis
![Svanen at Sheringham Shoal](https://www.orca-offshore.com/wp-content/uploads/2013/10/2009-08.big_-1-400x284.jpg)
Svanen at Sheringham Shoal
Date: March 2010
Client: Ballast Nedam International Projects
Product: Dynamic Mooring Analysis
![MCS Ailsa at Sheringham Shoal](https://www.orca-offshore.com/wp-content/uploads/2013/10/msalisia-400x284.jpg)
MCS Ailsa at Sheringham Shoal
Date: December 2009
Client: VolkerInfra Ltd.
Product: Dynamic Mooring Analysis
![Svanen at Bligh Bank BellWind Project](https://www.orca-offshore.com/wp-content/uploads/2013/10/2009-08.big_-400x284.jpg)
Svanen at Bligh Bank BellWind Project
Date: August 2009
Client: Ballast Nedam International
Product: Dynamic Mooring Analysis
![SIADAR Wave Power Scheme](https://www.orca-offshore.com/wp-content/uploads/2013/10/2009-03.big_-400x284.jpg)
SIADAR Wave Power Scheme
Date: May 2009
Client: Volker Construction International
Product: T&I Analysis
![Venture F3-FA](https://www.orca-offshore.com/wp-content/uploads/2013/10/f3struct-400x284.jpg)
Venture F3-FA
Date: April 2009
Client: SPT Offshore, IV Oil & Gas
Product: Structural Transport Analysis
![Semi-Submersible Basic Design – Modeltests](https://www.orca-offshore.com/wp-content/uploads/2013/10/2008-01.big_-400x284.jpg)
Semi-Submersible Basic Design – Modeltests
Date: August 2008
Client: Heerema Marine Contractors
Product: Basic Design