Venture F3-FA

Detailed transport and installation design of a SIP2 Self Installing platform.Scope included: Transport stability, motions, bollard pull, barge longitudinal strength analysis.
Dynamic analysis of platform installation, including set-down, mooring and overall workability analysis.

  • Transport Stability
  • Motions
  • Bolland Pull
  • Barge Longitudinal Strength Analysis
  • Dynamic Analysis of platform installation including: Set-down, mooring and overall workability analysis

 

Our client:

SPT Offshore

Product/Service:

Share: