Date: March 2023
Client: Ballast Nedam
Product: Marine Engineering
All
All
Offshore Support 16,000 ton Jacket
Date: March 2023
Client: Non-Disclosed
Product: Offshore Support
Crane Vessel Design
Date: August 2020
Client: Non Disclosed
Product: Structural Dynamic Lift
Dynamic Mooring Analysis Hutton Hull
Date: May 2021
Client: MBM Consultancy
Product: Mooring Analysis
Platform Transport Fatigue Analysis
Date: January 2021
Client: Non-Disclosed
Product: Structural Transport
East Cendor Platform Lift and Mooring Analysis with Asian Hercules III
Date: November 2019
Client: SPT Offshore
Product: Marine Engineering
DeltaCat Design for WTSU-010
Date: June 2020
Client: Offshore Wind Logistics b.v.
Product: Vessel Design
Marine T&I Analysis new production platform
Date: January 2020
Client: Non-disclosed
Product: Marine Engineering
Platform Relocation Analysis with Asian Hercules III
Date: August 2019
Client: SPT Offshore
Product: Marine Engineering
SPT Offshore – Dynamic Lift analysis
Date: Feb 2019
Client: SPT Offshore
Product: Lift Analysis
OWF Norther Offshore Wind Farm – Trencher launch and recovery
Date: Nov 2018
Client: DHLC and van Oord
Product: Lift Analysis
Lift Analysis – OWF Deutsch Bucht – Gripper Frame Seajack Scylla
Date: June 2018
Client: Eager.One
Product: Lift Analysis
Ship launch analysis
Date: March 2018
Client: Non Disclosed
Product: Stability Analysis
MALIN Minesto Buoy Project
Date: August 2017
Client: Malin Marine Consultants
Product: Motion Analysis
Van Oord Walney Extention OWF
Date: Jan 2017
Client: Van Oord
Product: Transport Analysis
Float-over incident
Date: August 2016
Client: Undisclosed Client
Product:Project
MonobaseWind Marine Design
Date: January 2016
Client: MonobaseWind b.v.
Product: transport and Installation
Dana Petroleum Western Isles Berth Mooring Analysis
Date: February 2017
Client: Keppel Verolme
Product: Dynamic Mooring Analysis
Lift Analysis Seajack Scylla
Date: June 2015
Client: Euro Rigging bv
Product: Lift Analysis
Van Oord Burbo Bank Extention OWF
Date: August 2015
Client: Van Oord
Product: Mooring Analysis
Drill Ship Sertao Berth Mooring analysis
Date: September 2015
Client: Okeanos bv
Product: Mooring Analysis
Vertiwind and Hywind Turbine Mating Analysis
Date: August 2015
Client: SPT Offshore
Product: Mating Analysis
SSCV Thialf Barge Mooring Analysis
Date: January 2015
Client: Heerema Marine Contractors
Product: Mooring Analysis
Spud Pile Mooring analysis
Date: December 2014
Client: Ballast Nedam
Product: Mooring and stability Analysis
Monobasewind Concept Modeltest
Date: November 2014
Client:Monobasewind bv
Product: Modeltest MonoBasewind
Marathon ALBA B3 Structural transport analysis
Date: July 2014
Client:IV Oil & Gas
Product: Structural Transport Analysis
Dragon Oil LAM-E Jacket and topside installation
Date: Aug 2014
Client: CNGS Group
Project: Dragon Oil Lam-E Platform
Product: Transport and Installation Design
Dredging Barge Mooring Analysis
Date: June 2014
Client: Kooiman Yard bv
Product: Dynamic Mooring Analysis
Ulstein Pipelay vessel Workability Analysis
Date: June 2014
Client: Ulstein
Product: Workability Analysis
Ulstein Sea of Solutions – Mooring analysis Transocean Semi Subs
Date: May 2014
Client: Ulstein Sea of Solutions bv
Product: Dynamic Mooring Analysis
Dutch Offshore Contractors Motion Response Unit
Date: May 2014
Client: Dutch Offshore Contractors bv
Product: Motion Response Unit
Sea Trucks Group Chevron Delta LQ platform Dynamic Lift Analysis
Date: March 2013
Client: Sea Trucks Group
Product: Dynamic Lift Analysis / Workability Analysis
Ballast Nedam Butendiek NMS Lifting Study
Date: December 2013
Client: Ballast Nedam
Product: Dynamics Lift Analysis
Keppel Verolme Scarabeo 5
Date: August 2013
Client: Keppel Verolme
Product: Berth Mooring Analysis
Chevron Delta South
Date: June 2013
Client: Sea Trucks Group
Product: CFD / Lift Analysis
ALE Mooring analysis
Date: February 2013
Client: ALE B.V.
Product: Dynamic Mooring Analysis
Ulstein Petrofac JSD600 Stinger Fatigue Analysis
Date: January 2013
Client: Ulstein
Product: Structural Fatigue Analysis
Statoil Gina Krog Jacket
Date: January 2013
Client: HFG Engineering
Product: Marine Design, T&I Analysis
Mooring Analysis Jascon 25
Date: December 2012
Client: Sea Trucks Group
Product: Dynamic Mooring Analysis
Zeetech Stinger Structural Analysis
Date: November 2012
Client: Zeetech / Ulstein
Product: Structural Analysis
Sevan Huntington Suction Pile Installation
Date: September 2012
Client: SPT Offshore / Sevan Marine
Product: Operational Analysis
ECO-V FPSO
Date: August 2012
Client: Maritima de Ecologia S.A. DE C.V.
Product: Dynamic Mooring Analysis
Global Tech 1 Project
Date: December 2011
Client: SPT Offshore / Keppel Verolme
Product: T&I Analysis
Dolwin Beta Project
Date: December 2011
Client: TenneT TSO B.V.
Product: Consultancy and Review
Workability Analysis for removal work
Date: November 2011
Client: PB Consultants
Product: Workability Analysis
SSCV Hermod
Date: October 2011
Client: Heerema Marine Contractors B.V.
Product: Dynamic Mooring Analysis
Workover Semi Submersible
Date: September 2011
Client: Dutch Offshore Innovations
Product: Workability Analysis
Large concrete Caisson
Date: September 2011
Client: Volker Construction International B.V.
Product: T&I Analysis
South Delta LQ installation
Date: August 2011
Client: Sea Trucks Group
Product: Marine Design
Q13a-A Amstel
Date: June 2013
Client: GDF Suez E&P Nederland B.V.
Product: Dynamic Docking Analysis
Consultancy and Interface management
Date: April 2011
Client: Shell U.K. Ltd. / NAM B.V.
Product: Interface Management, T&I Analysis
Stability analysis floating tunnel element
Date: January 2011
Client: Coentunnel Construction V.O.F.
Product: Stability Analysis
Operational Decision Support System
Date: February 2011
Client: Tideway Offshore Contractors
Product: ODS
IDEA Heavy Equipment
Date: December 2010
Client: IDEA Heavy Equipment
Product: Calculation of Lift Dynamic Amplification Factor
Carbon Trust Self Installing Wind Turbine
Date: September 2010
Client: SPT Offshore
Product: Marine Design
Venture/Centrica F3-FA
Date: September 2010
Client: SPT Offshore
Product: Operational Support, T&I Analysis
Frøy Jacket
Date: August 2010
Client: Heerema Fabrications Group
Product: Marine Design
Svanen at Walney Offshore Wind Farm 2
Date: July 2010
Client: Ballast Nedam International Projects
Product: Dynamic Mooring Analysis, Monopile Transport Analysis
Svanen at Sheringham Shoal
Date: March 2010
Client: Ballast Nedam International Projects
Product: Dynamic Mooring Analysis
MCS Ailsa at Sheringham Shoal
Date: December 2009
Client: VolkerInfra Ltd.
Product: Dynamic Mooring Analysis
Svanen at Bligh Bank BellWind Project
Date: August 2009
Client: Ballast Nedam International
Product: Dynamic Mooring Analysis
SIADAR Wave Power Scheme
Date: May 2009
Client: Volker Construction International
Product: T&I Analysis
Venture F3-FA
Date: April 2009
Client: SPT Offshore, IV Oil & Gas
Product: Structural Transport Analysis
Venture F3-FA
Date: February 2009
Client: SPT Offshore
Product: T&I Analysis
Semi-Submersible Basic Design – Modeltests
Date: August 2008
Client: Heerema Marine Contractors
Product: Basic Design
Delta Q13
Date: August 2008
Client: SPT Offshore
Product: Concept Design, T&I Analysis