Ballast Nedam Butendiek NMS Lifting Study

For Ballast Nedam project Butendiek Orca Offshore has performed a multibody dynamic lift analysis of the NMS (Noise Mitigation Screen). Scope of work included:

  • Transport analysis NMS hanging in crane and seafastened
  • Multibody lift analysis NMS and pile at various positions
    • Time domain Gap analysis, impact analysis and frequency domain analysis
  • Dynamic On Bottom Stability Analysis
    • Calculation of overturning moment and shear loads
    • Dynamic response of the NMS free standing on the soil
  • Dynamic Mooring Analysis for the Svanen
The above video shows the dynamic behaviour of the system and makes it clear why this method has been abandoned.

Our client:

Ballast Nedam

Product/Service:

Share: