For Ballast Nedam project Butendiek Orca Offshore has performed a multibody dynamic lift analysis of the NMS (Noise Mitigation Screen). Scope of work included:
- Transport analysis NMS hanging in crane and seafastened
- Multibody lift analysis NMS and pile at various positions
- Time domain Gap analysis, impact analysis and frequency domain analysis
- Dynamic On Bottom Stability Analysis
- Calculation of overturning moment and shear loads
- Dynamic response of the NMS free standing on the soil
- Dynamic Mooring Analysis for the Svanen
The above video shows the dynamic behaviour of the system and makes it clear why this method has been abandoned. |