Leg Mating Unit

Leg Mating Unit

Together with SeaCamel, we developed a new type of LMU for the float-over of the LAM-E topside. Different from existing designs, this design® allows for direct welding of the topside to the jacket after set down.
The phase whereby the topside is lowered by sand-jacks or equivalent equipment has been eliminated saving valuable installation time.
The LMU is built up with standard rubber elements, standard steel pipe and flush steel plates. As a result, the LMU has a short lead time and can be supplied at a competitive price.

Web Based Interface

Float-over Analysis

The latest projects done by Orca Offshore.

Offshore Support 16,000 ton Jacket

Offshore Support 16,000 ton Jacket

Date: March 2023
Client: Non-Disclosed
Product: Offshore Support

Marine T&I Analysis new production platform

Marine T&I Analysis new production platform

Date: January 2020
Client: Non-disclosed
Product: Marine Engineering

Float-over incident

Float-over incident

Date: August 2016
Client: Undisclosed Client
Product:Project

Vertiwind and Hywind Turbine Mating Analysis

Vertiwind and Hywind Turbine Mating Analysis

Date: August 2015
Client: SPT Offshore
Product: Mating Analysis