Leg Mating Unit
Leg Mating Unit
Together with SeaCamel, we developed a new type of LMU for the float-over of the LAM-E topside. Different from existing designs, this design® allows for direct welding of the topside to the jacket after set down.
The phase whereby the topside is lowered by sand-jacks or equivalent equipment has been eliminated saving valuable installation time.
The LMU is built up with standard rubber elements, standard steel pipe and flush steel plates. As a result, the LMU has a short lead time and can be supplied at a competitive price.
Web Based Interface
Float-over Analysis
The latest projects done by Orca Offshore.
![Marine T&I Analysis new production platform](https://www.orca-offshore.com/wp-content/uploads/2020/01/docking-lift-e1679825516592-400x284.jpg)
Marine T&I Analysis new production platform
Date: January 2020
Client: Non-disclosed
Product: Marine Engineering
![Vertiwind and Hywind Turbine Mating Analysis](https://www.orca-offshore.com/wp-content/uploads/2015/11/Afbeelding3-400x284.jpg)
Vertiwind and Hywind Turbine Mating Analysis
Date: August 2015
Client: SPT Offshore
Product: Mating Analysis