A full mooring design and analysis has been performed for the drill ship Sertao berth mooring in Teeport UK.
Scope for Orca Offshore included;
- Prepare 3D hull model of the vessel,
- Design mooring plan
- Purchase extreme wind data
- Perform full mooring analysis following GL-ND guidelines
- Prepare mooring plan CAD drawing