Date: August 2020
Client: Non Disclosed
Product: Structural Dynamic Lift
Marine Design
Marine Design
SSCV Thialf Barge Mooring Analysis
Date: January 2015
Client: Heerema Marine Contractors
Product: Mooring Analysis
Spud Pile Mooring analysis
Date: December 2014
Client: Ballast Nedam
Product: Mooring and stability Analysis
Statoil Gina Krog Jacket
Date: January 2013
Client: HFG Engineering
Product: Marine Design, T&I Analysis
South Delta LQ installation
Date: August 2011
Client: Sea Trucks Group
Product: Marine Design
Carbon Trust Self Installing Wind Turbine
Date: September 2010
Client: SPT Offshore
Product: Marine Design
Frøy Jacket
Date: August 2010
Client: Heerema Fabrications Group
Product: Marine Design