Orca Offshore has done a mooring design and analysis for the Hutton hull at Queens Dock. The Hutton hull will be scrapped at this dock. The scope of work for Orca included:
-
- Prepare 3D hull model of the hull,
- Design mooring plan
- Perform full mooring analysis following GL-ND guidelines
- Prepare mooring plan CAD drawing
The work was done for MBM-Consultancy.