SPT Offshore – Dynamic Lift analysis

Date: Feb 2019
Client: SPT Offshore
Product: Lift Analysis

OWF Norther Offshore Wind Farm – Trencher launch and recovery

Date: Nov 2018
Client: DHLC and van Oord
Product: Lift Analysis

Lift Analysis – OWF Deutsch Bucht – Gripper Frame Seajack Scylla

Date: June 2018
Client: Eager.One
Product: Lift Analysis

MALIN Minesto Buoy Project

Date: August 2017
Client: Malin Marine Consultants
Product: Motion Analysis


Van Oord Walney Extention OWF

Date: Jan 2017
Client: Van Oord
Product: Transport Analysis

MonobaseWind Marine Design

Date: January 2016
Client: MonobaseWind b.v.
Product: transport and Installation

Lift Analysis Seajack Scylla

Date: June 2015
Client: Euro Rigging bv
Product: Lift Analysis

Van Oord Burbo Bank Extention OWF

Date: August 2015
Client: Van Oord
Product: Mooring Analysis


Vertiwind and Hywind Turbine Mating Analysis

Date: August 2015
Client: SPT Offshore
Product: Mating Analysis

Spud Pile Mooring analysis

Date: December 2014
Client: Ballast Nedam
Product: Mooring and stability Analysis

Monobasewind Concept Modeltest

Date: November 2014
Client:Monobasewind bv
Product: Modeltest MonoBasewind

Ballast Nedam Butendiek NMS Lifting Study

Date: December 2013
Client: Ballast Nedam
Product: Dynamics Lift Analysis


Global Tech 1 Project

Date: December 2011
Client: SPT Offshore / Keppel Verolme
Product: T&I Analysis

Dolwin Beta Project

Date: December 2011
Client: TenneT TSO B.V.
Product: Consultancy and Review

Operational Decision Support System

Date: February 2011
Client: Tideway Offshore Contractors
Product: ODS

IDEA Heavy Equipment

Date: December 2010
Client: IDEA Heavy Equipment
Product: Calculation of Lift Dynamic Amplification Factor


Carbon Trust Self Installing Wind Turbine

Date: September 2010
Client: SPT Offshore
Product: Marine Design

Svanen at Walney Offshore Wind Farm 2

Date: July 2010
Client: Ballast Nedam International Projects
Product: Dynamic Mooring Analysis, Monopile Transport Analysis

Svanen at Sheringham Shoal

Date: March 2010
Client: Ballast Nedam International Projects
Product: Dynamic Mooring Analysis

MCS Ailsa at Sheringham Shoal

Date: December 2009
Client: VolkerInfra Ltd.
Product: Dynamic Mooring Analysis


Svanen at Bligh Bank BellWind Project

Date: August 2009
Client: Ballast Nedam International
Product: Dynamic Mooring Analysis

SIADAR Wave Power Scheme

Date: May 2009
Client: Volker Construction International
Product: T&I Analysis

TOP