Projects

Windplanblauw – Workability Analysis

Windplanblauw – Workability Analysis

Date: March 2023
Client: Ballast Nedam
Product: Marine Engineering

Offshore Support 16,000 ton Jacket

Offshore Support 16,000 ton Jacket

Date: March 2023
Client: Non-Disclosed
Product: Offshore Support

Crane Vessel Design

Crane Vessel Design

Date: August 2020
Client: Non Disclosed
Product: Structural Dynamic Lift

Dynamic Mooring Analysis Hutton Hull

Dynamic Mooring Analysis Hutton Hull

Date: May 2021
Client: MBM Consultancy
Product: Mooring Analysis

Platform Transport Fatigue Analysis

Platform Transport Fatigue Analysis

Date: January 2021
Client: Non-Disclosed
Product: Structural Transport

East Cendor Platform Lift and Mooring Analysis with Asian Hercules III

East Cendor Platform Lift and Mooring Analysis with Asian Hercules III

Date: November 2019
Client: SPT Offshore
Product: Marine Engineering

DeltaCat Design for WTSU-010

DeltaCat Design for WTSU-010

Date: June 2020
Client: Offshore Wind Logistics b.v.
Product: Vessel Design

Marine T&I Analysis new production platform

Marine T&I Analysis new production platform

Date: January 2020
Client: Non-disclosed
Product: Marine Engineering

Platform Relocation Analysis with Asian Hercules III

Platform Relocation Analysis with Asian Hercules III

Date: August 2019
Client: SPT Offshore
Product: Marine Engineering

SPT Offshore – Dynamic Lift analysis

SPT Offshore – Dynamic Lift analysis

Date: Feb 2019
Client: SPT Offshore
Product: Lift Analysis

OWF Norther Offshore Wind Farm – Trencher launch and recovery

OWF Norther Offshore Wind Farm – Trencher launch and recovery

Date: Nov 2018
Client: DHLC and van Oord
Product: Lift Analysis

Lift Analysis – OWF Deutsch Bucht – Gripper Frame Seajack Scylla

Lift Analysis – OWF Deutsch Bucht – Gripper Frame Seajack Scylla

Date: June 2018
Client: Eager.One
Product: Lift Analysis

Ship launch analysis

Ship launch analysis

Date: March 2018
Client: Non Disclosed
Product: Stability Analysis

MALIN Minesto Buoy Project

MALIN Minesto Buoy Project

Date: August 2017
Client: Malin Marine Consultants
Product: Motion Analysis

Van Oord Walney Extention OWF

Van Oord Walney Extention OWF

Date: Jan 2017
Client: Van Oord
Product: Transport Analysis

Float-over incident

Float-over incident

Date: August 2016
Client: Undisclosed Client
Product:Project

MonobaseWind Marine Design

MonobaseWind Marine Design

Date: January 2016
Client: MonobaseWind b.v.
Product: transport and Installation

Dana Petroleum Western Isles Berth Mooring Analysis

Dana Petroleum Western Isles Berth Mooring Analysis

Date: February 2017
Client: Keppel Verolme
Product: Dynamic Mooring Analysis

Ophir Platform Lift and Mooring Analysis with Asian Hercules II

Ophir Platform Lift and Mooring Analysis with Asian Hercules II

Date: August 2016
Client: SPT Offshore
Product: Marine Engineering

Alphen a/d Rijn crane accident

Alphen a/d Rijn crane accident

Date: June 2016
Client: Onderzoeksraad voor de veiligheid
Product:Project

Lift Analysis Seajack Scylla

Lift Analysis Seajack Scylla

Date: June 2015
Client: Euro Rigging bv
Product: Lift Analysis

Van Oord Burbo Bank Extention OWF

Van Oord Burbo Bank Extention OWF

Date: August 2015
Client: Van Oord
Product: Mooring Analysis

Drill Ship Sertao Berth Mooring analysis

Drill Ship Sertao Berth Mooring analysis

Date: September 2015
Client: Okeanos bv
Product: Mooring Analysis

Vertiwind and Hywind Turbine Mating Analysis

Vertiwind and Hywind Turbine Mating Analysis

Date: August 2015
Client: SPT Offshore
Product: Mating Analysis

SSCV Thialf Barge Mooring Analysis

SSCV Thialf Barge Mooring Analysis

Date: January 2015
Client: Heerema Marine Contractors
Product: Mooring Analysis

Spud Pile Mooring analysis

Spud Pile Mooring analysis

Date: December 2014
Client: Ballast Nedam
Product: Mooring and stability Analysis

Monobasewind Concept Modeltest

Monobasewind Concept Modeltest

Date: November 2014
Client:Monobasewind bv
Product: Modeltest MonoBasewind

Marathon ALBA B3 Structural transport analysis

Marathon ALBA B3 Structural transport analysis

Date: July 2014
Client:IV Oil & Gas
Product: Structural Transport Analysis

Dragon Oil LAM-E Jacket and topside installation

Dragon Oil LAM-E Jacket and topside installation

Date: Aug 2014
Client: CNGS Group
Project: Dragon Oil Lam-E Platform
Product: Transport and Installation Design

Dredging Barge Mooring Analysis

Dredging Barge Mooring Analysis

Date: June 2014
Client: Kooiman Yard bv
Product: Dynamic Mooring Analysis

Ulstein Pipelay vessel Workability Analysis

Ulstein Pipelay vessel Workability Analysis

Date: June 2014
Client: Ulstein
Product: Workability Analysis

Ulstein Sea of Solutions – Mooring analysis Transocean Semi Subs

Ulstein Sea of Solutions – Mooring analysis Transocean Semi Subs

Date: May 2014
Client: Ulstein Sea of Solutions bv
Product: Dynamic Mooring Analysis

Dutch Offshore Contractors Motion Response Unit

Dutch Offshore Contractors Motion Response Unit

Date: May 2014
Client: Dutch Offshore Contractors bv
Product: Motion Response Unit

Sea Trucks Group Chevron Delta LQ platform Dynamic Lift Analysis

Sea Trucks Group Chevron Delta LQ platform Dynamic Lift Analysis

Date: March 2013
Client: Sea Trucks Group
Product: Dynamic Lift Analysis / Workability Analysis

Ballast Nedam Butendiek NMS Lifting Study

Ballast Nedam Butendiek NMS Lifting Study

Date: December 2013
Client: Ballast Nedam
Product: Dynamics Lift Analysis

Keppel Verolme Scarabeo 5

Keppel Verolme Scarabeo 5

Date: August 2013
Client: Keppel Verolme
Product: Berth Mooring Analysis

Chevron Delta South

Chevron Delta South

Date: June 2013
Client: Sea Trucks Group
Product: CFD / Lift Analysis

ALE Mooring analysis

ALE Mooring analysis

Date: February 2013
Client: ALE B.V.
Product: Dynamic Mooring Analysis

Ulstein Petrofac JSD600 Stinger Fatigue Analysis

Ulstein Petrofac JSD600 Stinger Fatigue Analysis

Date: January 2013
Client: Ulstein
Product: Structural Fatigue Analysis

Statoil Gina Krog Jacket

Statoil Gina Krog Jacket

Date: January 2013
Client: HFG Engineering
Product: Marine Design, T&I Analysis

Mooring Analysis Jascon 25

Mooring Analysis Jascon 25

Date: December 2012
Client: Sea Trucks Group
Product: Dynamic Mooring Analysis

Zeetech Stinger Structural Analysis

Zeetech Stinger Structural Analysis

Date: November 2012
Client: Zeetech / Ulstein
Product: Structural Analysis

Sevan Huntington Suction Pile Installation

Sevan Huntington Suction Pile Installation

Date: September 2012
Client: SPT Offshore / Sevan Marine
Product: Operational Analysis

ECO-V FPSO

ECO-V FPSO

Date: August 2012
Client: Maritima de Ecologia S.A. DE C.V.
Product: Dynamic Mooring Analysis

Global Tech 1 Project

Global Tech 1 Project

Date: December 2011
Client: SPT Offshore / Keppel Verolme
Product: T&I Analysis

Dolwin Beta Project

Dolwin Beta Project

Date: December 2011
Client: TenneT TSO B.V.
Product: Consultancy and Review

Workability Analysis for removal work

Workability Analysis for removal work

Date: November 2011
Client: PB Consultants
Product: Workability Analysis

SSCV Hermod

SSCV Hermod

Date: October 2011
Client: Heerema Marine Contractors B.V.
Product: Dynamic Mooring Analysis

Workover Semi Submersible

Workover Semi Submersible

Date: September 2011
Client: Dutch Offshore Innovations
Product: Workability Analysis

Large concrete Caisson

Large concrete Caisson

Date: September 2011
Client: Volker Construction International B.V.
Product: T&I Analysis

South Delta LQ installation

South Delta LQ installation

Date: August 2011
Client: Sea Trucks Group
Product: Marine Design

Q13a-A Amstel

Q13a-A Amstel

Date: June 2013
Client: GDF Suez E&P Nederland B.V.
Product: Dynamic Docking Analysis

Consultancy and Interface management

Consultancy and Interface management

Date: April 2011
Client: Shell U.K. Ltd. / NAM B.V.
Product: Interface Management, T&I Analysis

Stability analysis floating tunnel element

Stability analysis floating tunnel element

Date: January 2011
Client: Coentunnel Construction V.O.F.
Product: Stability Analysis

Operational Decision Support System

Operational Decision Support System

Date: February 2011
Client: Tideway Offshore Contractors
Product: ODS

IDEA Heavy Equipment

IDEA Heavy Equipment

Date: December 2010
Client: IDEA Heavy Equipment
Product: Calculation of Lift Dynamic Amplification Factor

Carbon Trust Self Installing Wind Turbine

Carbon Trust Self Installing Wind Turbine

Date: September 2010
Client: SPT Offshore
Product: Marine Design

Venture/Centrica F3-FA

Venture/Centrica F3-FA

Date: September 2010
Client: SPT Offshore
Product: Operational Support, T&I Analysis

Frøy Jacket

Frøy Jacket

Date: August 2010
Client: Heerema Fabrications Group
Product: Marine Design

Svanen at Walney Offshore Wind Farm 2

Svanen at Walney Offshore Wind Farm 2

Date: July 2010
Client: Ballast Nedam International Projects
Product: Dynamic Mooring Analysis, Monopile Transport Analysis

Svanen at Sheringham Shoal

Svanen at Sheringham Shoal

Date: March 2010
Client: Ballast Nedam International Projects
Product: Dynamic Mooring Analysis

MCS Ailsa at Sheringham Shoal

MCS Ailsa at Sheringham Shoal

Date: December 2009
Client: VolkerInfra Ltd.
Product: Dynamic Mooring Analysis

Svanen at Bligh Bank BellWind Project

Svanen at Bligh Bank BellWind Project

Date: August 2009
Client: Ballast Nedam International
Product: Dynamic Mooring Analysis

SIADAR Wave Power Scheme

SIADAR Wave Power Scheme

Date: May 2009
Client: Volker Construction International
Product: T&I Analysis

Venture F3-FA

Venture F3-FA

Date: April 2009
Client: SPT Offshore, IV Oil & Gas
Product: Structural Transport Analysis

Venture F3-FA

Venture F3-FA

Date: February 2009
Client: SPT Offshore
Product: T&I Analysis

Semi-Submersible Basic Design – Modeltests

Semi-Submersible Basic Design – Modeltests

Date: August 2008
Client: Heerema Marine Contractors
Product: Basic Design

Delta Q13

Delta Q13

Date: August 2008
Client: SPT Offshore
Product: Concept Design, T&I Analysis